Last night a Patron of the District was able to machine a part to get the motor coupled with the pump stack. Work crew has been working all day trying to troubleshoot in order to get the pump working. They have not been successful yet, and work is continuing.
The reservoir is at 1.7 feet.
Please minimize water use! We are doing everything we possibly can do to get the system back online.