Thursday, February 25, 2021

Update - Test Results

To all Patrons:

As an extra measure of assurance, the District had taken, and sent in, water samples for testing on Tuesday after the system had recovered sufficiently.  Just received Coliform test results from the lab this morning.  All tests, for all zones, were good.

Tuesday, February 23, 2021

Reservoir Level Approaching Half Full

To All Patrons:

Thank you all for minimizing/stopping water use over the last few days.  With the repair of the valve allowing the operation of the 40 HP pump beginning early this morning, along with the cleaning of Bay 2,  the reservoir is now approaching half full.

Although, the reservoir is not fully recovered, the District believes that Patrons can begin to resume normal water use at this time.

During this event, DEQ has NOT REQUIRED a Boil Order, but the District has opted to take samples from the three different zones of the District and submit them for testing today as an additional measure of assurance.  We will have results of those tests on Thursday.

Note:  To correct some misunderstanding of the request from the District over the last few days, Patrons were asked to curtail water use.  We have had several Patrons who interpreted the water use conservation request as an indication that the water was not drinkable.  Working closely with DEQ and our interim licensed charge operator during these recent system failures, the District was not directed to declare that the water was not potable. 

If you have not already done so, please subscribe to the KCWD#1 blog by filling in your email address in the box on the left of this Home page, and then activating your subscription using the link that will be sent to your email address.  You will receive an email once per day if new information is posted on the KCWD#1 blog.  

If you are accessing the blog on your mobile phone, scroll down on the mobile phone home page, and you will see a link below the "Home" button for the "View Web Version".  If you tap on the "View Web Version" link, you can get to the view that allows access to the email subscription box.



Monday, February 22, 2021

Cla Valve Repaired - 40 HP Pump on Standby

 All Patrons:

Our service provider was able to install a valve from a piece of District surplus equipment to replace the obsolete valve that failed on Saturday.  The good news is that it is a newer valve and if we ever need to repair it, replacement parts are more readily available.  The replacement enables the use of the 40 HP pump which can be turned on when the Contact Chamber recovers to a level that will accommodate the 40 HP pumping volume.

At this time, we are seeing the Contact Chamber level rising steadily, even with the 20 HP pump still running, so turning on the 40 HP pump is planned to happen this evening.

It is important that Patrons understand that the 20 HP pumping volume is just keeping up with current Patron demand, and cannot fill the main reservoir at the same time!  When the reservoir has no water, Patrons at higher elevations lose their water service!  We asked all Patrons to stop water use (or absolutely minimize use) until the main reservoir is recovered, but either Patrons are not cooperating or are still unaware that their water use is slowing the system recovery.  Please help your neighbors out, and curtail water use until the District notifies everyone that the reservoir is at a sustainable level!


If you have not already done so, please subscribe to the KCWD#1 blog by filling in your email address in the box on the left of this Home page, and then activating your subscription using the link that will be sent to your email address.  You will receive an email once per day if new information is posted on the KCWD#1 blog.

KOOTENAI COUNTY WATER DISTRICT NO. 1 BOARD OF DIRECTORS MEETING

 The KCWD1 regular Board of Directors meeting is this Wednesday February 24, 2021 at 6:00 p,m. located at 7739 E. Sunnyside Rd.  Agenda is posted in the Agenda pages.

System Continuing to Recover

All Patrons,

20 HP pump shut off some time during the night due to a low current setting.  Was put back on line at around 7:30 AM, and has been pumping water since.  Reservoir still in recovery.  As of 9:00 PM last night, level was not rising, possibly due to Patrons' use.  

PLEASE HOLD OFF ON WATER USE UNTIL NOTIFIED BY THE DISTRICT THAT WE HAVE RECOVERED THE RESERVOIR AND PUMPING CAPABILITIES WITH WATER PRODUCTION.

Crew is in the process of cleaning Bay 2.  

No update yet from valve service provider.

If you have not already done so, please subscribe to the KCWD#1 blog by filling in your email address in the box on the left of this Home page, and then activating your subscription using the link that will be sent to your email address.  You will receive an email once per day if new information is posted on the KCWD#1 blog.

Sunday, February 21, 2021

20 HP Pump Back up and Moving Water

To All Patrons,

The 20 HP Pump is back on line as of 3:45 PM this afternoon, and is moving water into the system mains.  The filter bays at this time seem to be producing enough water to the contact chamber to keep the 20 HP pump running, and since the Cla valve has been isolated, we believe that we will be able to continue to recover the system through the night.

You may begin to see water pressure later this evening, but please hold off on water use until notified that the reservoir has been substantially recovered.

We will have a service provider on site tomorrow to give us the options for repairing or replacing the Cla valve.  Getting the valve working properly will allow the 40 HP pump to move more water contingent on having enough flow from the filter bays.

A crew will be cleaning Bay 2 tomorrow, but it requires another day to restart it properly before that filtered water can be routed back to the contact chamber, possibly Wednesday earliest.

If you have not already done so, please subscribe to the KCWD#1 blog by filling in your email address in the box on the left of this Home page, and then activating your subscription using the link that will be sent to your email address.  You will receive an email once per day if new information is posted on the KCWD#1 blog.


Valve Failure - Second Pump Failure!

Update 2:12 PM:  Starter for 20 HP Pump located and service provide en route to install.


PLEASE DO NOT USE ANY WATER UNTIL FURTHER NOTICE!

It has been discovered that the Cla valve diaphragm has failed at the contact chamber, and the service provider's attempt at a temporary fix did not work.  The service provider is trying to expedite an overnight shipment from New York for the replacement diaphragm of the District's obsolete valve, and we are waiting for a confirmation.

The 20 HP pump starter has also failed, and we are trying to get a replacement starter installed as soon as possible.  AS A RESULT, WE ARE NOT ABLE TO PUMP ANY WATER INTO THE SYSTEM AT THIS TIME.  When the pump is restarted, water will be able to be moved into the system through a manual process, but recovery will be slow.

IMPORTANT!  EVEN IF YOU STILL HAVE SOME WATER PRESSURE, PLEASE DO NOT USE ANY WATER AT THIS TIME SO THAT WE DO NOT DE-PRESSURIZE THE SYSTEM.