Update 2/21/17

Construction crews are back on site with shoring to prevent cave-ins we lost some ground overnight as the hole  caved in and put about three more feet of material on top of the previous excavation we're optimistic that they should dig down to the joint that we suspect is the broken connection hopefully within several hours. I have clean drinking water here at the office so please bring your water jugs down and I would be glad to fill them. Mike.