Thursday, May 25, 2023

Water System is Fully Recovered - Normal Water Use Can Resume

The KCWD#1 water system is fully recovered and is operating normally at this time.  Outside watering and normal water use can be resumed.


The repair of the leak on the main near the reservoir will be done sometime next week, but is not anticipated to cause any interruption of water production or service.  This repair will allow the system to operate as it has in the past, but the District will be incorporating improvements to this infrastructure during the build of the new reservoir in the Capital Improvements Phase 2 Project, now in the Engineering design stage.