Monday, January 15, 2024

Raw Water Pump House Failure Update

The raw water intake Pump House continued to operate through the night on generator power, and the sand filters are operating and actively replenishing the reservoir and distribution system.  The Electrical Contractor was successful in locating a replacement transformer this morning, and after an emergency Board approval, is en route to picking it up and will be on site to begin the repair.  The District is anticipating, barring any unforeseen issues, that the repair will be completed today, and the system will return to "normal" operation.

Please continue to minimize water use until the District provides notice that the system has been returned to normal operation (i.e. off generator power).